| Location | Kıbrıs / Gazi Mağusa |
Total SQM | 1486 m2 |
| Start | 02.10.2006 |
End | 07.03.2007 |
| House | 1 |
A hospital which has been constructed three-storeyed LGS building on existing reinforced concrete two-storeyed frame system. The hospital was active for 24 hours during construction period.