Cyprus Yaşam Hospital

LocationKıbrıs / Gazi Mağusa Total SQM1486 m2
Start02.10.2006 End07.03.2007
House1

A hospital which has been constructed three-storeyed LGS building on existing reinforced concrete two-storeyed frame system. The hospital was active for 24 hours during construction period.