| Location | UAE / Abu Dhabi |
Total SQM | 136.000 m2 |
| Start | 05.01.09 |
End | 2009 |
| House | 34 |
Commodore Contracting Co.’s workers camp project with the social fa¬cilities has 136.000 m2 built area. First phase of the project has started in 05.01.2009 with the scope of 5 blocks with the 40.000 m2 covered area for engineers residentials and social facility buildings.